Production Process

From the workshop
to your living space.

From the first conversation to handover, every step is run with transparency and a focus on quality.

Step by Step

How does the
process work?

We treat every project as a life story of its own. The process runs together with our client from beginning to end; each step is explained and approved.

  1. 01

    ≈ 1–2 weeks

    First Conversation & Project Analysis

    We review the site data, climate conditions and building permit requirements. The most suitable concept is chosen against the budget and the list of needs.

  2. 02

    ≈ 3–6 weeks

    Architectural Design

    Starting from the selected model, the architectural project is adapted to the conditions of the site. Floor plans and elevations are delivered.

  3. 03

    ≈ Variable

    Permit & Approvals

    Structural calculations and the technical project are prepared for the local authorities. This phase varies from region to region.

  4. 04

    ≈ 4–10 weeks

    Workshop Production

    Timber frame elements and straw-bale panels are prepared and numbered in the workshop. Quality control applies at every stage.

  5. 05

    ≈ 4–8 weeks

    On-site Assembly

    The prefabricated system keeps assembly short. The frame goes up on the foundation, followed by the straw-bale infill, plaster and façade work.

  6. 06

    ≈ 1–2 weeks

    Handover & Warranty

    Once all interior and exterior work is complete, the building is handed over with its technical documentation and maintenance guide.

Durations are typical ranges; they vary with the scope of the project, the site and permit conditions.

Real Construction

Photographs from site